Rail project employs 10,000 Nigerians – Agbakoba, …Says project to create 100.000 more jobs

Spread the news

Rail project employs 10,000 Nigerians – Agbakoba,

.Says project to create 100.000 more jobs

.Trains 68 personnel in Malaysia on railway operations

By Joel ThankGod & Udeme Clement

“About 10,000 Nigerians were employed during the construction of Abuja Light Rail Project, recently commissioned by President Muhammadu Buhari, while 100,000 more will be directly or indirectly employed when the project begins full operation”.

The Chief Resident Engineer for the Abuja Light Rail Project, Mr. Anthony Agbakoba, disclosed this yesterday while briefing the Minister of Information and Culture, Alhaji Lai Mohammed, who took journalists on a tour of the project.

 Agbakoba disclosed that in addition, 68 highly-skilled personnel have been trained in Malaysia and China on Railway operations and management, in order to build the required technical capacity needed to run such a modern rail system.

He said, “The Federal Capital Territory Administration, FCTA, and Nigeria now have capacity to supervise similar railway construction projects from start to completion within three to four years of conception”.

While conducting the Minister and his team round the train stations, the Secretary of Transportation in FCTA, Mr. Kayode Opeifa, said that the present administration inherited the Abuja Light Project at 53percent completion stage and delivered the project within 18 months.

He said, “The project is the first integrated mode of Transportation in Africa that connects the railways and the airport, in order to ensure seamless movement of passengers”.

 Opeifa said a desk would be assigned to the Federal Ministry of Information and Culture at the Airport Station, to showcase the nation’s rich cultural heritage and tourism attraction, adding that the station itself is a tourist attraction.

He said, “Although the Abuja Light Rail is currently on a test run with three coaches, contract for construction and supply of 48 additional coaches has been awarded, with the coaches expected to be delivered in batches.

In his remarks, the Minister said, “Buhari Administration is building a legacy of enduring infrastructure for posterity.

This administration is not looking for quick fixes because quick fixes don’t work. We are laying a foundation for an enduring infrastructural development. We are painstaking and very transparent and we remain focused and committed”.

Alhaji Mohammed expressed confidence that Nigeria possesses the required technical competence to manage the Light Rail Project and turn it into a huge success.

“Some of the key personnel, who have worked in virtually major rail companies in the world, are actually anchoring the programme. Some of them have been trained in the best schools in the world for transportation. So, we are confident of the expertise and experience of the personnel that are handling the light rail and the regional rail,” he said.

The 45.2-kilometre Light Rail Project, which is divided into six lots, comprises 12 stations, 50 culverts, 13 railway bridges, 9 pedestrian bridges, 15 flyovers, and a 21-building Rolling Stock Depot.

Since kick-starting the nationwide tour of Federal Government projects in May 2018, the Minister has inspected eight projects, including the Lagos-Ibadan Standard Gauge Rail Line, Lagos-Ibadan, Oyo-Ogbomoso and Enugu-Port Harcourt Expressways, and the Second Niger Bridge.

error: Content is protected !!